City of Fitchburg, MA – CSS 4D Sewer Separation Project Information
A sewer and drain construction project will begin construction in October, 2013 and continue through the summer of 2015. The project area is generally bound by the Nashua River to the south, Holman Street to the north, Cedar Street and Atlantic Avenue to the west, and Boutelle Street to the east. A related project includes the replacement of the sanitary sewer along John Fitch Highway from Pearl Street to Intervale Road. 

The goal of the project is to construct a new storm sewer system in order to eliminate three Combined Sewer Overflows (CSOs) in the project area and improve water quality in the Nashua River. The project includes installation of approximately 25,000 feet of storm sewers and sanitary sewers, sewer and manhole rehabilitation, water main replacement, and paving. 

Revoli Construction Company from Franklin, MA will be the general contractor for this project.

The following documents have been provided in PDF format. To acquire a free PDF file viewer, please visit the Adobe Reader website (http://get.adobe.com/reader).


Questions, comments, and responses from Ward 6 meeting held Monday, October 20, 2014.

Comprehensive Construction Schedule

December 16, 2014 Update:

The Contractor will be performing street excavation work, associated with the City’s CSS 4D sewer separation project, on streets near your home. Work will be on the following streets over the next two to three weeks, as shown in the three-week "look ahead" schedule.

The contractor will be cleaning up many project areas, preparing for a winter shutdown anticipated for January-April, 2015.

  • Boutelle (Goodrich to Lunenburg)
  • Catch basins on Boutelle, Culley, Goodrich

Paving priorities:
1. Boutelle Street
2. Atlantic Street
3. Patches/Repairs throughout project areas
4. Line striping and pavement markings

Curbing priorities:
1. Patches/Repairs throughout project areas, mostly at new catch basins

Steps to file a claim for the CSS 4D Construction Work
If any resident, motor vehicle operator, or pedestrian believes and asserts that they have suffered injury and/or property damages that are the result of the CSS-4D contract operations, they should complete the Claim Form (as instructed on the form) and submit the form to the Mayor’s Office, where the matter will be forwarded to both the Fitchburg Legal Office and the City’s insurer (Massachusetts Interlocal Insurance Association). If the claim is deemed an issue of the Contractor’s work or operations, the claim will be forwarded to the Contractor’s insurance.
Link to Claim Form

Project Map

What type of construction will be on my street?

April 7, 2014 Public Information Meeting Minutes

Public Meeting Presentation held on August 29, 2013

Minutes for Public Meeting held on August 29, 2013

City of Fitchburg Wastewater Department

If you have any questions regarding this project or the materials, feel free to contact the following:

Michael Theriault, PE
Lead Project Engineer
Wright-Pierce
175 Ammon Drive, Suite 208
Manchester, NH 03103
(603) 606-4435
mike.theriault@wright-pierce.com  

Laurie Perkins, PE
Project Manager
Wright-Pierce
175 Ammon Drive, Suite 208
Manchester, NH 03103
(603) 606-4420
CSS4D-info@wright-pierce.com


Unitil Gas has been performing gas utility infrastructure and replacement work in advance of the City CSS-4D project work in those streets where the CSS-4D work is to be performed. In the event that a question or concern arises regarding Unitil’s work, please contact Jon Croteau.

Jonathan Croteau
Unitil Gas Construction Supervisor
285 John Fitch Highway
Fitchburg, MA 01420
Office:  (978) 353-3236
Cell:  (978) 360-4117
croteau@unitil.com