Houlton, ME – Phase 2 Water Main Design: Water Main Material Solicitation

Project Status:
Bids Results Available
Project Location:
Houlton, ME
General Bids Due:
Bid Opening Location:
08/13/2025 1:00 pm
Houlton Water Company Office 21 Bangor Street, Houlton, ME 04730
Project Owner:
Houlton Water Company
Description:

Furnishing Water Main materials for the replacement of approximately 6,600 ft of 10-inch asbestos cement (AC) water main with 12” ductile iron water main. New water main to be installed parallel to the existing main within the water company’s existing cross-country right of way (ROW). The existing water main will remain in service during the installation of the replacement water main. Includes the relocation of approximately 500 feet of cross-country water main behind Aurora Circle and Reservoir Road. Project includes interconnections to the existing water main at the Reservoir Hill Tank with provisions to connect to a new booster pump station and at the White Settlement Road booster station with provisions to bypass the station upon completion of a new booster station closer to the tank.

Project Engineer:
WP Project Number:
Darrin Lary, PE
21608
Directions to download or purchase paper copy sets.
  • Follow the hyperlink to the project provided at the end of the project information.
  • First time users will need to register for a FREE account.
    • If you have not previously registered, click on Create New Company.
    • Fill out the forms and Create user Account.
    • You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
  • You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
  • If downloading, click on View Download Queue and then Proceed to Download.

BIDDING QUESTIONS?

Connect with us!

Please fill out the form below to get in touch regarding questions on any of our active bids. A member of our team will reach out to you soon.

  • This field is for validation purposes and should be left unchanged.