Projects to Bid

Kittery, ME – P-1080 Water Main Improvements MOD A

Project Status:
Active
Project Location:
Kittery, ME
General Bids Due:
Bid Opening Location:
11/03/2026 2:00 pm
Kittery Water District Office located at 17 State Road, Kittery, ME 03904
Project Owner:
Kittery Water District
Description:

The Project includes the following Work:

Installation of approximately 240 linear feet of 16-inch HDPE water main on Whipple Road, including valves, hydrants, services, appurtenances, restoration, and initial trench paving and full-width final pavement overlay as detailed on the design plans. This portion of the project requires archaeological monitoring and coordination with the Portsmouth Naval Shipyard.

Replacement of approximately 4,360 linear feet of existing 12-inch cast iron water main on Route 1, Adams Drive, and Route 1 Bypass with 20-inch ductile iron water main, including valves, hydrants, services, appurtenances, restoration, and initial trench paving and half width final pavement overlay as detailed on the design plans. This portion of the project requires construction to be completed during nighttime hours, except for the work on Adams Drive (STA 446+50 to STA 463+00). There is also an alternative bid item which includes half width paving of the other half of Adams Drive that is not planned to be impacted by the water main installation scope.

Replacement of approximately 3,600 linear feet of existing 12-inch and 16-inch cast iron water mains on Rogers Road, Rogers Road Extension, and State Road with 24-inch ductile iron water main, including valves, hydrants, services, appurtenances, restoration, and initial trench paving and half width final pavement overlay as detailed on the design plans. This portion of the project requires temporary water and archaeological monitoring.

Installation of approximately 640 linear feet of 12-inch ductile iron water main in the Route 1 traffic circle and Rogers Road, including valves, hydrants, services, appurtenances, restoration, and initial trench paving and half width final pavement overlay as detailed on the design plans. This portion of the project requires construction to be completed during nighttime hours.

A portion of the Route 1 project scope is located within MaineDOT right-of-way and will be subject to the requirements of the MaineDOT Highway Access Permit located in Appendix A.

Pre-Bid Conf. Date:
Pre-Bid Conf. Location:
A pre-bid conference for the Project will be held on Tuesday, October 20, 2026, at 2:00 PM (Mandatory)
17 State Road, Kittery, ME 03904
Project Engineer:
WP Project Number:
Collin Stuart, PE
21675
Directions to download or purchase paper copy sets.
  • Follow the hyperlink to the project provided at the end of the project information.
  • First time users will need to register for a FREE account.
    • If you have not previously registered, click on Create New Company.
    • Fill out the forms and Create user Account.
    • You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
  • You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
  • If downloading, click on View Download Queue and then Proceed to Download.