Projects to Bid
Brunswick, ME – Contract 2 Taylor Replacement Well 6
The Project includes the following Work:
The Project consists of the installation of a new 100 HP submersible well pump and transmitter, yard piping improvements, and abandonment and capping of Wells 2 & 3 including removal of the pump, column pipe, level element, and wellhead at the Taylor Well site in Brunswick, Maine. The Project also consists of a new control panel, removal and replacement of two variable frequency drives, two new sine wave filters, installation of 12-inch raw water flow meter and associated process piping, and pressure transmitter assembly at the Taylor Station Water Treatment Facility. Electrical site work will include demolition of existing underground power/control conduit from Taylor Station to the Taylor Well site, and new power and control conduit and wire.
- Follow the hyperlink to the project provided at the end of the project information.
- First time users will need to register for a FREE account.
- If you have not previously registered, click on Create New Company.
- Fill out the forms and Create user Account.
- You will receive a confirmation email that you will need to click on to activate your account. (Check Spam filter if you do not receive it.)
- You may either Download or Order a paper copy to be shipped to you from Xpress Copy.
- If downloading, click on View Download Queue and then Proceed to Download.